Items where Division is "Fakultas Teknik > Teknik Sipil" and Year is 2020
Up a level |
A
ADA BINA AVIZAN, 03118095 (2020) PERBANDINGAN PERENCANAAN STRUKTUR GEDUNG DENGAN METODE SNI 2847-2013 DAN SOFTWARE SAP2000 V.19 CODE ACI 318-14. Undergraduate thesis, Universitas Narotama.
B
Bahaswan, Rizal (2020) Financing Model for Small-Medium Scale Contractors in Indonesian. In: Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, Harare, Zimbabwe.
Bahaswan, Rizal (2020) Innovation within Small-Medium Scale Contractors in Indonesia. THE SPIRIT OF SOCIETY JOURNAL, 4 (1). pp. 57-65. ISSN 2594-4777 (Online) – 2597-4742 (Print)
L
Lindah Sri Aminingtiyas, 03119047 (2020) ANALISIS PERCEPATAN PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG TOWER ITS 1 (SATU) DENGAN METODE TIME COST TRADE OFF. Undergraduate thesis, Universitas Narotama.
M
Mudjanarko, Sri Wiwoho and Rasidi, Nawir and Sutowijoyo, Hendro and Koespiadi, Koespiadi and Sunantiyo, Ari and Limantara, Arthur Daniel and Ibrahim, Mohd Haziman Wan and Wiwoho, Firdaus Pratama and Mulyadi, Irwan (2020) Analysis of The Model of the Use of Hollow Type A Foundation for Small Houses. International Journal of Advance Science and Technology, 29 (10S). pp. 1443-1447. ISSN 2005-4238
Muhammad Farid Hadi Parmanto, 03117061 (2020) ANALISIS PERBANDINGAN KARAKTERISTIK STABILITAS CAMPURAN ASPAL KARET UNTUK LAPISAN ASPAL BETON AC - BC. Undergraduate thesis, Universitas Narotama.
R
Reza Yoga Widya Baskara, 03115137 (2020) PENGARUH PENYEMPITAN JALAN TERHADAP KARAKTERISTIK LALU LINTAS. Undergraduate thesis, Universitas Narotama.
Ryan Ferdiansyah, 03117007 (2020) EVALUASI PENGENDALIAN WAKTU DAN BIAYA PADA PROYEK RUKO MENGGUNAKAN METODE EARNED VALUE DAN FAST TRACK. Undergraduate thesis, Universitas Narotama.