STUDI KELAYAKAN INVESTASI SISTEM INSTALASI AIR BERSIH DI DISTRIC ERMERA SUB-DISTRIC GLENO,TIMOR LESTE

Joanina M. N. Da Silva, 03115031 (2019) STUDI KELAYAKAN INVESTASI SISTEM INSTALASI AIR BERSIH DI DISTRIC ERMERA SUB-DISTRIC GLENO,TIMOR LESTE. Undergraduate thesis, Universitas Narotama.

[img] Text (HALAMAN JUDUL)
COVER.pdf

Download (5MB)
[img] Text (BAB I)
BAB I.pdf

Download (5MB)
[img] Text (BAB II)
BAB II.pdf

Download (5MB)
[img] Text (BAB III)
BAB III.pdf

Download (5MB)
[img] Text (BAB IV)
BAB IV.pdf

Download (5MB)
[img] Text (BAB V)
BAB V.pdf

Download (5MB)
[img] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (5MB)

Abstract

Growth of population count in every time, then the need of the for clean water is the also enhancment, to solve the problem is the needed of an installation system cleane water is the worthy. Feasibility study is an activity do for know about worthy or not worthy of the an project that the seen of various aspects such as financial aspect and social economic aspect before that project implemented. The purpose of this activity to the know investation feasibility of installation clean water in the gleno city and to discover effect of investation feasibility to the give revenue. On the investment phase the feasibility study of the clean water installasion system that there in the ermera distric, sub-distric gleno timor leste are using Net present value (NPV), Internal rate of rentrum (IRR), and Benefit Cost Ratio (IRC) whereas to find out the effec of investment feasibility to the revenue that give seen from fund the region revenue is abaout 20% and reserve fund general is about 15% From the results of the calculation of financial aspects that is obtained NPV>0 around Rp. 235.667.254 > 0, BCR > 1 around 1.421 > 1, IRR > 1,50% around 2.75% > 1,50 whereas the for aspects social economic that consist of the fund developmental regional general fund reserve NPV against fund developmental regional around 47.133.451, BCR against fund developmental regional around 0,285 and IRR against fund developmental regional around 0,55 % whereas NPV against general fund reserve around 35.350.088, BCR against general fund reserve around 0,22 and IRR against general fund reserve around 0,41%. Keywords: Clean Water Installation, Investment Feasibility

Item Type: Thesis (Undergraduate)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TD Environmental technology. Sanitary engineering
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Repository Administrator
Date Deposited: 24 Aug 2021 01:53
Last Modified: 13 Jun 2022 07:52
URI: http://repository.narotama.ac.id/id/eprint/929

Actions (login required)

View Item View Item
["lib/irstats2:embedded:summary_page:eprint:downloads" not defined]