Items where Subject is "T Technology > TH Building construction"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | B | D | E | G | H | I | K | L | M | N | R | S | W | Y
Number of items at this level: 74.

A

ACHMAD SAFRI SYAMSUDIN, 03117014 (2022) ANALISA KINERJA BIAYA DAN WAKTU PADA CONTROLLING PROYEK KONTRUKSI DENGAN METODE “PERT” (Studi Kasus: Gedung Parkir Universitas Airlangga). Undergraduate thesis, Universitas Narotama.

ADA BINA AVIZAN, 03118095 (2020) PERBANDINGAN PERENCANAAN STRUKTUR GEDUNG DENGAN METODE SNI 2847-2013 DAN SOFTWARE SAP2000 V.19 CODE ACI 318-14. Undergraduate thesis, Universitas Narotama.

ADHITYA BAYU PRATAMA, 03115027 (2019) STUDI ANALISIS STRUKTUR GEDUNG BETON BERTULANG TUJUH LANTAI DAN SATU BASEMENT DENGAN MENGGUNAKAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS. Undergraduate thesis, Universitas Narotama Surabaya.

ADITYA BAGUS SETIADI, 03118012 (2023) ANALISIS PERBANDINGAN PELAT KONVENSIONAL DENGAN PELAT PRECAST HALF SLAB DITINJAU DARI SEGI WAKTU DAN BIAYA PADA PROYEK RUMAH NEGARA KPP PRATAMA SIDOARJO SELATAN. Undergraduate thesis, Universitas Narotama.

ALGERIA KUSUMA, 03121036 (2022) ANALISIS PERBANDINGAN BIAYA DAN WAKTU BEKISTING METODE KONVENSIONAL DENGAN METODE SEMI-SISTEM UNTUK KOLOM HOTEL NAMIRA SURABAYA. Undergraduate thesis, Universitas Narotama.

ANDRE FERDIAN SALEH, 03117005 (2021) ANALISIS KUAT LENTUR MATERIAL GALVALUM PROFIL C SEBAGAI KOMPONEN BANGUNAN. Undergraduate thesis, Universitas Narotama.

ARUM SEPTINAWATI, 03121084 (2023) ANALISIS BIAYA DAN WAKTU DENGAN MENGGUNAKAN METODE EARNED VALUE PADA PROYEK APARTEMEN KYO SOCIETY SURABAYA. Undergraduate thesis, Universitas Narotama.

Abdul Muhamin, 03114136 (2019) PENGARUH PENAMBAHAN ADDITIVE JENIS ”X” DENGAN FOAM AGENT DAN SERABUT KELAPA TERHADAP BETON. Undergraduate thesis, Universitas Narotama Surabaya.

Achmad Shodiq, 03113089 (2018) PENULANGAN PELAT BETON DENGAN MENGGUNAKAN ROTAN DAN BAMBU. Undergraduate thesis, Universitas Narotama Surabaya.

Ardabil Maulana, 03114148 (2019) OPTIMALISASI WAKTU DENGAN MENGGUNAKAN METODE CPM, PERT DAN PDM PADA PROYEK PEMBANGUNAN GEDUNG DINAS SOSIAL DAN DINAS KELAUTAN KABUPATEN GRESIK. Undergraduate thesis, Universitas Narotama Surabaya.

Awiyaningsih, Sri and Moetrimo, Hary and Mudjanarko, Sri Wiwoho (2018) Analisis Dampak Lalu Lintas Pembangunan Mall Lagoon Avenue Sungkono Terhadap Kinerja Simpang Di Jalan Mayjend Sungkono - HR Muhammad Surabaya. TEKNIKA: Engineering and Sains journal, 2 (2). pp. 131-134. ISSN 2579-5422 (online) 2580-4146 (print)

B

BAYU ARKAN PAMBUDI, 03117029 (2022) ANALISIS PENJADWALAN PROYEK PEMBANGUNAN BASEMEN APARTEMEN GRAND SHAMAYA DITENGAH PANDEMI MENGGUNAKAN METODE PERT. Undergraduate thesis, Universitas Narotama.

BIMA SENA GUNARTA, 03114165 (2018) PERENCANAAN GEDUNG HOTEL 12 LANTAI DENGAN KONSTRUKSI BETON. Undergraduate thesis, Universitas Narotama Surabaya.

Bahaswan, Rizal (2020) Financing Model for Small-Medium Scale Contractors in Indonesian. In: Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, Harare, Zimbabwe.

Bahaswan, Rizal (2020) Innovation within Small-Medium Scale Contractors in Indonesia. THE SPIRIT OF SOCIETY JOURNAL, 4 (1). pp. 57-65. ISSN 2594-4777 (Online) – 2597-4742 (Print)

Bima Bagas Priambada, 03119105 (2022) ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN JAM KERJA EMPAT JAM DAN SISTEM SHIFT KERJA (Studi kasus : Proyek Pembangunan Puskesmas Pace Dinas Kesehatan Kabupaten Nganjuk). Undergraduate thesis, Universitas Narotama.

D

DENNY PRATAMA, 03117002 (2021) METODE LINE OF BALANCE PADA GEDUNG FMIPA TOWER ITS SURABAYA UNTUK PENJADWALAN PEKERJAAN ARSITEKTUR DAN MEP. Undergraduate thesis, Universitas Narotama.

DIMAS ADE PRANATA, 03117025 (2022) ANALISIS MANAGEMENT SERVICES MODELLING RUMAH SUSUN SURABAYA SERTA DAMPAK PADA KENYAMANAN PENGHUNI. Undergraduate thesis, Universitas Narotama.

Debby Hendika Putra, 03119104 (2021) DESAIN STRUKTUR BANGUNAN RUMAH SUSUN SEDERHANA SEWA (RUSUNAWA) TOWER A DI JAKARTA DENGAN SRPMK DAN DINDING GESER. Undergraduate thesis, Universitas Narotama.

Dika Yuniarsi, 03117110 (2019) PENGARUH KETERAMPILAN TENAGA KONSTRUKSI DENGAN PERMODELAN BUILDING INFORMATION MODELING (BIM) UNTUK PENCAPAIAN ORGANISASI KONSTRUKSI PADA KEBERHASILAN PERUSAHAAN. Undergraduate thesis, Universitas Narotama.

E

EKO ADI PRASTYO, 03117049 (2022) ANALISA STRUKTUR GEDUNG 10 LANTAI, DENGAN BAJA KOMPOSIT, BEDASARKAN SNI 1729-2020 DAN SNI 2847-2019 Studi Kasus : SMP Petra 6 Sidoarjo. Undergraduate thesis, Universitas Narotama.

ESAM SHARYAN MUTHANNA AL-HELALI, 03118103 (2022) THE USE OF GREEN BUILDING MATERIALS IN THE CONSTRUCTION INDUSTRY. Undergraduate thesis, Universitas Narotama.

G

GALUH PRAMESWARI BINANGKIT, 03119127 (2021) EVALUASI PELAKSANAAN PEKERJAAN PEMASANGAN TIANG PANCANG PROYEK PERKUATAN STRUKTUR DERMAGA BERLIAN PERAK SURABAYA. Undergraduate thesis, Universitas Narotama.

GUSTIN NURIKA DEFVI, 03117085 (2022) SISTEM PENGADAAN BARANG DAN JASA PT. ADHI PERSADA GEDUNG PADA PROYEK APARTEMENT BeSS MANSION SURABAYA. Undergraduate thesis, Universitas Narotama.

H

HADI SAPUTRO, 03116101 (2019) EVALUASI DESAIN & BIAYA STRUKTUR GEDUNG APARTEMEN GUNAWANGSA GRESIK DENGAN MENGGUNAKAN DINDING STRUKTUR BETON BERTULANG TAHAN GEMPA. Undergraduate thesis, Universitas Narotama Surabaya.

HASFIKAR, 03116051 (2021) ANALISIS METODE PROGRAM EVALUATION REVIEW TECHNIQUE (PERT) PADA PROYEK PEMBANGUNAN GEDUNG PUSAT LAYANAN STROKE RUMAH SAKIT HAJI SURABAYA. Undergraduate thesis, Universitas Narotama.

HENDRA KURNIAWAN, 03117009 (2021) ANALISIS RISIKO PENYELESAIAN PEKERJAAN MENGGUNAKAN METODE ANALISIS HIERARCHY PROCESS ( STUDI KASUS : PROYEK KAMPUS II UINSA ). Undergraduate thesis, Universitas Narotama.

Harjian Maprilana, 03115043 (2019) ANALISA PENJADWALAN PROYEK ARSITEKTUR MENGGUNAKAN METODE CPM (STUDI KASUS PROYEK APARTEMEN TOWER CASPIAN SURABAYA). Undergraduate thesis, Universitas Narotama.

Harmanto, Dani and Sukoco, Agus and Setiawan, M. Ikhsan and Mudjanarko, Sri Wiwoho (2018) Framework Of Improving The Quality and Lower The Cost Build For The Real Estate Industry in Indonesia. In: International Conference on Industrial Engineering and Operation Management, March 6-8, 2019, Bandung.

Huda, Miftahul and Mursidi, Hary and Mudjanarko, Sri Wiwoho and Utomo, Wahyu Mulyo (2018) Analysis of Deflection and Moment Capacity On The Precast Beam Of The Nk-Spircon Connecting System. International of Engineering and Technology, 7 (3.25). pp. 458-462. ISSN 458-462

I

INTAN MUTIARA RAJA, 03118135 (2021) ANALISIS VALUE ENGINEERING PADA GEDUNG ASRAMA UNAIR KAMPUS C DENGAN KONSEP GREEN BUILDING PADA ITEM PEKERJAAN ACIAN DINDING. Undergraduate thesis, Universitas Narotama.

IQBAL TSANI, 03121037 (2022) PERENCANAAN BEKISTING SEMI SISTEM (KNOCK DOWN) PADA PEMBANGUNAN GEDUNG OFFICE BUKIT DARMO GOLF SURABAYA. Undergraduate thesis, Universitas Narotama.

Indra Setiawan Walla, 03115109 (2019) ANALISIS SUHU DI DALAM RAFT FOUNDATION MENGGUNAKAN METODE SURFACE INSULATION PADA PROYEK GRAND SUNGKONO LAGOON. Undergraduate thesis, Universitas Narotama.

K

Koespiadi, Koespiadi (2015) Variables Affecting the Quality of Story Building Design Document. Journal of Basic and Applied Scientific Research, 5 (12). pp. 30-34. ISSN 2090-4304

Koespiadi, Koespiadi and Kurniawan, Fredy and Arimbawa, Gede and Mudjanarko, Sri Wiwoho and Rasidi, Nawir (2016) TECHNOLOGY MODEL PRECAST FOUNDATION FOR ECO FRIENDLY SOLUTION. In: Proceeding Forum in Research, Science, and Technology (FIRST) 2016, October 18 – 19, 2016, State Polytechnic of Sriwijaya, Palembang, Indonesia.

Koespiadi, Koespiadi and Kurniawan, Fredy and Arimbawa, Gede and Rasidi, Nawir (2016) Panduan Praktis Pembuatan Fondasi Precast: Memandu pembaca bisa melakukan pembuatan Fondasi pracetak dengan teknik sederhana dan bisa dilakukan secara mandiri. Narotama University Press. ISBN 978-602-60314-8-8

Koespiadi, Koespiadi and Mudjanarko, Sri Wiwoho and Rasidi, Nawir and Pamungkas, Jakson Wahyu and Putro, Prastyo Adi and Iqbal, Fahmi Maulana and Sutrisno, Andrias Eko Adi and Ilyas, Muhamad Farid and Wiwoho, Firdaus Pratama (2018) FONDASI PRACETAK TRAPESIUM BUKU JILID 1. Narotama University Press, Surabaya. ISBN 978-602-6557-44-5

Koespiadi, Koespiadi and Mudjanarko, Sri Wiwoho and Rasidi, Nawir and Utomo, Wahyu Mulyo and Alimudin, Arasy and Suprayitno, Dadang and Haksama, Setya and Lusno, M. Farid Dimyati and Madun, Aziman Bin and Wiwoho, Firdaus Pratama and Pamungkas, Jakson Wahyu and Limantara, Arthur Daniel (2018) The Concrete Quality Testing for Trapezoidal Model of the Prefabricated Foundation. International Journal of Engineering & Technology, 7 (3.25). pp. 311-315. ISSN 2227-524X

Koespiadi, Koespiadi and Mudjanarko, Sri Wiwoho and Setiawan, Muhammad Ikhsan (2019) PEMILIHAN ALTERNATIF PENEMPATAN LOKASI JEMBATAN (Studi Kasus Jembatan Sambaliung – Gunung Tabur Kabupaten Berau). Astonjadro : Jurnal Rekayasa Sipil, 8 (1). pp. 35-43. ISSN p-ISSN 2302-4240 e-ISSN 2655-2086

Koespiadi, Koespiadi and Nugraha, Vito Adivta and MHP, Primashita and S.A, Dimas Bagas (2019) PELAKSANAAN SISTEM LONCAT 2 LANTAI UNTUK GEDUNG BERTINGKAT RANGKA BAJA. PADURAKSA, 8 (2). pp. 200-212. ISSN E-ISSN 2581-2939 dan P-ISSN 2303-2693

L

LELI PURNIYAWANTI, 03118044 (2021) ANALISIS VALUE ENGINEERING PADA GEDUNG KULIAH BERSAMA UNIVERSITAS AIRLANGGA KAMPUS C SURABAYA. Undergraduate thesis, Universitas Narotama.

Leo Agus Sulistianto, 03117120 (2022) EVALUASI PEMELIHARAAN GEDUNG DENGAN PERMODELAN VIRTUAL 3D BIM (STUDI KASUS GEDUNG SSC SURABAYA). Undergraduate thesis, Universitas Narotama.

Liliana Hannes, 03117039 (2021) ANALISA DAMPAK PANDEMI COVID-19 PADA SEKTOR INDUSTRI KONSTRUKSI (STUDI KASUS PROYEK PEMBANGUNAN RSUD SOEDONO MADIUN). Undergraduate thesis, Universitas Narotama.

Lindah Sri Aminingtiyas, 03119047 (2020) ANALISIS PERCEPATAN PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG TOWER ITS 1 (SATU) DENGAN METODE TIME COST TRADE OFF. Undergraduate thesis, Universitas Narotama.

M

MOKHAMMAD HANDY BUDIARTO, 03118163 (2022) PENGARUH PENERAPAN SISTEM MANAJAMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) TERHADAP PRODUKTIFITAS TENAGA KERJA PADA PROYEK KONTRUKSI DI SURABAYA ( Studi Kasus Pembangunan Apartemen PT Tata Bumi Raya ). Undergraduate thesis, Universitas Narotama.

MUHAMAD SIHABUDIN, 03114069 (2018) PERBANDINGAN PERENCANAAN STRUKTUR GEDUNG MENGGUNAKAN METODE STRUKTUR BETON KONVENSIONAL DAN STRUKTUR KOMPOSIT BAJA – BETON DITINJAU DARI SEGI BIAYA DAN WAKTU PADA GEDUNG RAWAT INAP RS LAVALETTE MALANG. Undergraduate thesis, Universitas Narotama Surabaya.

MUHAMMAD FAHYAN SYNATRIA PUTRA, 03117070 (2022) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN PEKERJAAN DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Pembangunan Perikanan dan Kelautan Universitas Airlangga). Undergraduate thesis, Universitas Narotama.

Moch. Alfaruq Junaedi, 03117106 (2021) METODE WORK SAMPLING SEBAGAI UJI PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR PEMBANGUNAN GUDANG PT. SUPARMA TBK. Undergraduate thesis, Universitas Narotama.

Mohammad Irfandio Kurniawan, 03118046 (2021) EVALUASI PENGENDALIAN WAKTU DAN BIAYA PROYEK KONSTRUKSI BERDASARKAN METODE EARNED VALUE DAN CRASH PROJECT (Studi Kasus Pada Proyek Pembangunan SMP Negeri 1 Surabaya). Undergraduate thesis, Universitas Narotama.

Mudjanarko, Sri Wiwoho and Koespiadi, Koespiadi and Suprayitno, and Limantara, Arthur Daniel (2019) Variasi HDPE (High Density Polyethylene) Untuk Lapis Aus Asphalt Concrete Wearing Coarse (AC-WC). Scopindo Media Pustaka. ISBN 978-623-92163-2-0

Mudjanarko, Sri Wiwoho and Mayestino, Machicky and Rasidi, Nawir and Indrawan, Indrawan and Setiawan, Muhammad Ikhsan (2017) Bamboo Waste as Part of The Aggregate Pavement The Way Green Instructure in The Future. MATEC Web Conference (138). pp. 1-10.

Mudjanarko, Sri Wiwoho and Rasidi, Nawir and Koespiadi, Koespiadi and Setiawan, Wahyu and Ibrahim, Mohd Haziman Wan and Juki, Mohd Irwan Bin and Jaya, Ramadhansyah Putra (2019) FONDASI PRACETAK TRAPESIUM TEKNIK MENGGAMBAR AUTOCAD. Scopindo Media Pustaka. ISBN 978-623-92163-6-8

Mudjanarko, Sri Wiwoho and Rasidi, Nawir and Sutowijoyo, Hendro and Koespiadi, Koespiadi and Sunantiyo, Ari and Limantara, Arthur Daniel and Ibrahim, Mohd Haziman Wan and Wiwoho, Firdaus Pratama and Mulyadi, Irwan (2020) Analysis of The Model of the Use of Hollow Type A Foundation for Small Houses. International Journal of Advance Science and Technology, 29 (10S). pp. 1443-1447. ISSN 2005-4238

Mudjanarko, Sri Wiwoho and Rasidi, Nawir and Zacoeb, Achfas and Bagio, Tony Hartono (2019) Membangun Rumah Skala Kecil Menengah Dengan Konstruksi Fondasi Lubang Pracetak Di Era Industri 4.0. In: Seminar Nasional dan Workshop 2019 (SWLPPM 2019) Era Revolusi Industri 4.0: Inovasi Penelitian Dalam Menunjang Kompetensi Sumber Daya Manusia Industri Infrastruktur, 12-13 Juli 2019, Universitas Narotama Surabaya.

Muhamad Arif, 03114026 (2018) ANALISA PENGARUH PENAMBAHAN PASIR KUARSA, TANAH PEDEL DAN FLY ASH PADA BETON MUTU TINGGI. Undergraduate thesis, Universitas Narotama Surabaya.

Muhammad Alfian Eko Buwono, 03117016 (2021) ANALISA PERBANDINGAN METODE PELAKSANAAN DINDING PENAHAN TANAH SOLDIER PILE DAN SHEET PILE PADA PEMBANGUNAN GWT PT. UBS SURABAYA. Undergraduate thesis, Universitas Narotama.

Muhammad Hoiri, 03116066 (2021) PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) (STUDI KASUS: PROYEK PEMBANGUNAN GEDUNG PUSAT LAYANAN STROKE RUMAH SAKIT HAJI SURABAYA). Undergraduate thesis, Universitas Narotama.

N

Nurkholik Irawanto, 03114141 (2018) PENGENDALIAN BIAYA DAN WAKTU PELAKSANAAN PROYEK MENGGUNAKAN ANALISA NILAI HASIL (EARNED VALUE ANALYSIS) PADA PROYEK PEMBANGUNAN KONDOMINIUM DI SURABAYA. Undergraduate thesis, Universitas Narotama Surabaya.

R

Ragil Ara Winda, 03115012 (2019) STUDI PERENCANAAN KELOMPOK FONDASI DALAM TOWER CRANE (STUDI KASUS : PEMBANGUNAN GEDUNG BERTINGKAT 18 LANTAI DI SURABAYA BARAT). Undergraduate thesis, Universitas Narotama.

Rakhmadi Thoriq Fajar Sugiyono, 03120028 (2022) ANALISIS PERBANDINGAN KUALITAS, WAKTU DAN BIAYA DALAM PENGGUNAAN BEKISTING METODE SEMI SISTEM DENGAN METODE ALUMUNIUM FORMWORK PADA PROYEK OSAKA RIVERVIEW APARTMENT, TANGERANG. Undergraduate thesis, Universitas Narotama.

Ramadhana Sangyang Ady, 03117004 (2021) VALUE ENGINEERING PEMBANGUNAN GEDUNG SAINTEK KAMPUS UINSA 2. Undergraduate thesis, Universitas Narotama.

Rendra Dirga Alfianda, 03117054 (2021) METODE KERJA PELAKSANAAN PEMBANGUNAN RANGKA BETON MENGGUNAKAN SISTEM LONCAT LANTAI (SLL). Undergraduate thesis, Universitas Narotama.

Rochman, Zainur and Mudjanarko, Sri Wiwoho and Harmanto, Dani (2018) Effect on The Hardness Paving Block by Adding Gomuti and Pumice Stone. In: International Conference on Industrial Engineering and Operation Management, 6-8 March 2018, Bandung.

Ryan Ferdiansyah, 03117007 (2020) EVALUASI PENGENDALIAN WAKTU DAN BIAYA PADA PROYEK RUKO MENGGUNAKAN METODE EARNED VALUE DAN FAST TRACK. Undergraduate thesis, Universitas Narotama.

S

SUGENG HARIYANTO, 03120064 (2022) ANALISIS KEPUASAN PENGHUNI RUMAH SUSUN PASCA PEMBANGUNAN KEMBALI STUDI KASUS RUSUN SOMBO BLOK E PEMERINTAH KOTA SURABAYA. Undergraduate thesis, Universitas Narotama.

Sami Nasser Omar Bakarman, 03114001 (2019) Structural Steel Analysis And Design Of Commercial Factories For Loading And Earthquake Resistance. Undergraduate thesis, Universitas Narotama.

Setiawan, M Ikhsan and Dhaniarti, Iswachyu and Hasyim, Cholil and Mahendra, Wahyu and Atmaja, T and , Sugeng and Utomo, Wahyu Mulyo and Sukoco, Agus and Mudjanarko, Sri Wiwoho and Suyono, Joko and Sudapet, I Nyoman and Nasihien, Ronny Durrotun and Wulandari, Dyah Ayu and Ade, Reswanda T and Prasetijo, Joewono and Kurniasih, Nuning and Wajdi, Muh Barid Nizaruddin (2018) Correlations Analysis of Airport Sustainability and Local Government Budget. International Journal of Integrated Engineering, 10 (2). pp. 71-76.

Setiawan, Muhammad Ikhsan and Sukoco, Agus and Mudjanarko, Sri Wiwoho and Nasihien, Ronny Durrotun and Suyono, Joko and Hermanto, Dani and Bon, Abdul Talib Bin and Ibrahim, Mohd Haziman Wan (2019) Indonesian Airport, Passanger and Aircraft Impact on Regional Budget (APBD). In: International Conference on Industrial Engineering and Operations Management, March 5-7, 2019, Bangkok, Thailand.

Sita Ramandhani Arumsari Susanto, 03115063 (2019) ANALISIS STRUKTUR GEDUNG APARTEMEN 33 LANTAI DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS. Undergraduate thesis, Universitas Narotama.

Syahrul Irawan, 03117022 (2021) ANALISIS PERBANDINGAN ANGGARAN BIAYA PADA PEKERJAAN STRUKTUR DAN ARSITEKTUR PROYEK PEMBANGUNAN RUKO DENGAN METODE BOW DAN PERATURAN MENTERI PUPR NO 28 TAHUN 2016. Undergraduate thesis, Universitas Narotama.

W

WAHYU HIDAYATULLAH, 03121035 (2022) ANALISIS PERBANDINGAN WAKTU DAN BIAYA METODE STRUKTUR SLAB DENGAN DROP PANEL DAN SLAB DENGAN BALOK PADA GEDUNG SMA MUHAMMADIYAH 1 GRESIK. Undergraduate thesis, Universitas Narotama.

WILDAN AMRULLAH, 03113013 (2019) DESAIN PERENCANAAN STRUKTUR GEDUNG 38 LANTAI DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS (SRPMK) STUDI KASUS : APARTMENT 88 AVENUE SURABAYA. Undergraduate thesis, Universitas Narotama Surabaya.

Wrendi Novendra Palawan, 03117051 (2021) METODE AHP DALAM PEMILIHAN FAKTOR DOMINAN PENYEBAB KETERLAMBATAN PROYEK APARTEMEN GRAND SHAMAYA SURABAYA. Undergraduate thesis, Universitas Narotama.

Y

YOSI ARTA SARAGI, 03121034 (2022) ANALISIS PERBANDINGAN BIAYA DAN WAKTU BEKISTING METODE KONVENSIONAL DENGAN METODE SEMI-SISTEM PADA KOLOM LANTAI 1-7 TOWER B APARTEMEN GUNAWANGSA GRESIK. Undergraduate thesis, Universitas Narotama.

This list was generated on Tue Apr 23 19:45:17 2024 WIB.