Items where Division is "Fakultas Teknik > Magister Teknik Sipil" and Year is 2026
![]() | Up a level |
A
ARIF ROSYADI, 13124025 (2026) ANALISIS RISIKO TERHADAP MUTU, WAKTU, DAN BIAYA KONSTRUKSI REHABILITASI RUAS JALAN SAPIH - PUNCAKSARI (R.89) KECAMATAN LUMBANG, KABUPATEN PROBOLINGGO. Masters thesis, UNIVERSITAS NAROTAMA.
D
DWI RUDIYANTO, 13124116 (2026) PENGARUH FAKTOR RISIKO TERINTEGRASI TERHADAP KETERLAMBATAN WAKTU PADA PROYEK PEMBANGUNAN RUMAH SAKIT DENGAN SISTEM DESIGN AND BUILD. Masters thesis, UNIVERSITAS NAROTAMA.
K
KHARIEZMA MAULIDHA, 13123079 (2026) PENGARUH METODE EARNED VALUE MANAGEMENT TERHADAP AKURASI KINERJA DAN KEBERHASILAN PROYEK KONSTRUKSI (STUDI KASUS : GEDUNG PUSAT OLEH-OLEH KHAS PROBOLINGGO DI KRAKSAAN). Masters thesis, UNIVERSITAS NAROTAMA.
S
SONY ANDRIANTO, 13124186 (2026) MANAJEMEN RISIKO KESELAMATAN KESEHATAN KERJA (K3) PADA PROYEK PEMBANGUNAN EMBUNG TERUNG DI KABUPATEN MAGETAN. Masters thesis, UNIVERSITAS NAROTAMA.
SULTONI, 13124066 (2026) RASIONALISASI JARINGAN STASIUN HUJAN DI SUBDAS AFVOUR WATUDAKON KABUPATEN JOMBANG. Masters thesis, UNIVERSITAS NAROTAMA.
SUPARDIONO, 13124138 (2026) ANALISIS PERLINDUNGAN HUKUM TERHADAP PENYEDIA JASA KONSTRUKSI TERKAIT WANPRESTASI OLEH PENGGUNA JASA KONSTRUKSI. Masters thesis, UNIVERSITAS NAROTAMA.
W
WAHYU BUDI KUSUMA, 1324094 (2026) “OPTIMALISASI PERKERASAN JALAN DULASIM SEBAGAI JALAN ARTERI UNTUK KENDARAAN BERAT MENUJU PELABUHAN GRESIK”. Masters thesis, UNIVERSITAS NAROTAMA.
WAHYU WINARNO, 13124165 (2026) STRATEGI KEPEMIMPINAN DALAM MENINGKATKAN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROSES KONSTRUKSI DAN PRODUKSI DI INDUSTRI SEMEN: STUDI KASUS DI PT SEMEN IMASCO ASIATIC. Masters thesis, UNIVERSITAS NAROTAMA.
WAHYU YALA NANGGALA, 13124062 (2026) PENGARUH AKURASI DATA GEOLISTRIK TERHADAP PERENCANAAN DAN PENGENDALIAN BIAYA PADA PROYEK PENGEBORAN SUMUR BOR AIR DALAM. Masters thesis, UNIVERSITAS NAROTAMA.
WAN NAZLI AKBAR, 13124023 (2026) EVALUASI DAN VALIDASI DATA CURAH HUJAN SATELIT GPM- IMERG DI DAS SEMAJID KABUPATEN PAMEKASAN. Masters thesis, UNIVERSITAS NAROTAMA.
WILLY BUDIMAN, 13124205 (2026) ANALISIS MANAJEMEN WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE EARNED VALUE ANALYSIS DAN METODE CRASHING (STUDI KASUS PADA PROYEK PEMBANGUNAN/PENATAAN SARANA DAN PRASARANA BATALYON INFANTERI 631/ANTANG). Masters thesis, UNIVERSITAS NAROTAMA.
Y
YUSRIZAL, 13124119 (2026) PERBANDINGAN PENGENDALIAN BIAYA, MUTU, DAN WAKTU MENGGUNAKAN METODE KONVENSIONAL DAN METODE BIM (Studi Kasus: Manajemen Konstruksi Pembangunan Hunian Vertikal TNI 4 Tower di IKN). Masters thesis, UNIVERSITAS NAROTAMA.
Z
ZULIAN PRATAMA, 13124017 (2026) ANALISIS PENYEBAB PEMBENGKAKAN BIAYA PADA PROYEK KONSTRUKSI DAN UPAYA MITIGASI PADA PEKERJAAN PENINGKATAN JALAN AKHMAD KASIM RT 02 DESA SUMBER SARI KEC. LOA KULU. Masters thesis, UNIVERSITAS NAROTAMA.
