Items where Division is "Fakultas Teknik > Teknik Sipil" and Year is 2022

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: A | B | C | D | E | F | G | I | J | L | M | P | R | S | T | W | Y
Number of items: 53.

A

ACHMAD MARZUKI FERDIANTO, 03117052, (2022) HUBUNGAN TINGKAT PENGETAHUAN KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KEDISIPLINAN PEKERJA DI MASA PANDEMI COVID-19 PROYEK PASAR BURUNG DOLLY SURABAYA. Undergraduate thesis, Universitas Narotama.

ACHMAD SAFRI SYAMSUDIN, 03117014 (2022) ANALISA KINERJA BIAYA DAN WAKTU PADA CONTROLLING PROYEK KONTRUKSI DENGAN METODE “PERT” (Studi Kasus: Gedung Parkir Universitas Airlangga). Undergraduate thesis, Universitas Narotama.

AHMAD ZAKY SUJONO PUTRA, 03117065, (2022) RENCANA PERALIHAN PENGGUNA SEPEDA MOTOR KE BUS BTS JURUSAN TERMINAL PORONG - TERMINAL LARANGAN - TERMINAL PURABAYA - TERMINAL BUNDER. Undergraduate thesis, Universitas Narotama.

ALAMIN WAHYU ZAQIRA REYHAN, 03116087, (2022) ANALISA PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING (Studi Kasus : Pembangunan Gedung Parkir Bertingkat Rumah Sakit Saiful Anwar Malang). Undergraduate thesis, Universitas Narotama.

ALGERIA KUSUMA, 03121036 (2022) ANALISIS PERBANDINGAN BIAYA DAN WAKTU BEKISTING METODE KONVENSIONAL DENGAN METODE SEMI-SISTEM UNTUK KOLOM HOTEL NAMIRA SURABAYA. Undergraduate thesis, Universitas Narotama.

ANDIKA PURNAMA DWI SETYAWAN, 03119068 (2022) KAJIAN TEKNIS PENGEMBANGAN LAHAN KHUSUSNYA PADA TERMINAL MULTIPURPOSE LABUAN BAJO. Undergraduate thesis, Universitas Narotama.

ANISA MEIYANUR, 0311803 (2022) ANALISA ESKALASI BIAYA (PENYESUAIAN HARGA) PADA PROYEK INFRASTRUKTUR MULTIYEARS (TAHUN JAMAK) (Studi Kasus : Proyek Pembangunan Long Storage Kalimati untuk Air Baku di Kabupaten Sidoarjo). Undergraduate thesis, Universitas Narotama.

ARELL ADRITAMA, 03118147 (2022) ANALISA KERUSAKAN JALAN TAMBAK OSOWILANGON MENGGUNAKAN METODE PCI. Undergraduate thesis, Universitas Narotama.

ARI SUJIARTONO, 03118148 (2022) ANALISIS KARAKTERISTIK MODIFIKASI ASBUTON BUTIR B 50/30 DENGAN ASPAL PEN 60/70. Undergraduate thesis, Universitas Narotama.

ASIH PRATIWI, 03121038 (2022) METODE EARNED VALUE ANALYSIS (EVA) TERHADAP KINERJA WAKTU DAN BIAYA PEKERJAAN RIGID JALAN PADA PROYEK PELEBARAN JALAN BETOYO – DAGANG KECAMATAN MANYAR KABUPATEN GRESIK. Undergraduate thesis, Universitas Narotama.

Andra Arditya Medianto, 03117115 (2022) PERENCANAAN TUBUH BENDUNGAN TIPE URUGAN BENDUNGAN TUGU DESA NGLINGGIS, KECAMATAN TUGU, KABUPATEN TRENGGALEK, JAWA TIMUR. Undergraduate thesis, Universitas Narotama.

B

BADRUDDIN, 03119052 (2022) ANALISIS KEBUTUHAN AIR IRIGASI DI DAERAH IRIGASI PONDOK WALUH KABUPATEN JEMBER MENGGUNAKAN PROGRAM CROPWAT. Undergraduate thesis, Universitas Narotama.

BANUR HUDAH ROSEANTORO, 03118035 (2022) ANALISIS PERBANDINGAN KINERJA PENGGUNAAN KISDAM JUMBO BAG DENGAN PORTADAM TERHADAP BIAYA DAN WAKTU PELAKSANAAN SEBAGAI DEWATERING (Studi Kasus : Rehabilitasi Jaringan Irigasi DI. Siman di Kabupaten Kediri). Undergraduate thesis, Universitas Narotama.

BAYU ARKAN PAMBUDI, 03117029 (2022) ANALISIS PENJADWALAN PROYEK PEMBANGUNAN BASEMEN APARTEMEN GRAND SHAMAYA DITENGAH PANDEMI MENGGUNAKAN METODE PERT. Undergraduate thesis, Universitas Narotama.

Bima Bagas Priambada, 03119105 (2022) ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN JAM KERJA EMPAT JAM DAN SISTEM SHIFT KERJA (Studi kasus : Proyek Pembangunan Puskesmas Pace Dinas Kesehatan Kabupaten Nganjuk). Undergraduate thesis, Universitas Narotama.

C

CINDY AQ’TAVIA, 03117028 (2022) ANALISIS DAN STUDI PENURUNAN TANAH TIMBUNAN PADA PEKERJAAN REKLAMASI DI ATAS TANAH LUNAK. Undergraduate thesis, Universitas Narotama.

D

DIMAS ADE PRANATA, 03117025 (2022) ANALISIS MANAGEMENT SERVICES MODELLING RUMAH SUSUN SURABAYA SERTA DAMPAK PADA KENYAMANAN PENGHUNI. Undergraduate thesis, Universitas Narotama.

E

EKO ADI PRASTYO, 03117049 (2022) ANALISA STRUKTUR GEDUNG 10 LANTAI, DENGAN BAJA KOMPOSIT, BEDASARKAN SNI 1729-2020 DAN SNI 2847-2019 Studi Kasus : SMP Petra 6 Sidoarjo. Undergraduate thesis, Universitas Narotama.

ERIDHITA KRISTHYA DEVIANTI, 03117034 (2022) ANALISIS KEMAUAN PENUMPANG MENGGUNAKAN ANGKUTAN UMUM PERKOTAAN PADA SAAT COVID–19 (Studi Kasus Suroboyo Bus Rute Barat–Timur). Undergraduate thesis, Universitas Narotama.

ESAM SHARYAN MUTHANNA AL-HELALI, 03118103 (2022) THE USE OF GREEN BUILDING MATERIALS IN THE CONSTRUCTION INDUSTRY. Undergraduate thesis, Universitas Narotama.

Erick Hansel Santoso, 03117011 (2022) ANALISIS POTENSI LIKUEFAKSI PASCA GEMPA BUMI PADA DESA SAMBIK BENGKOL, KECAMATAN GANGGA, KABUPATEN LOMBOK UTARA. Undergraduate thesis, Universitas Narotama.

F

FRIDOLIN SUGIANDO, 03118015 (2022) ANALISIS NILAI HASIL (EARNED VALUE) TERHADAP WAKTU PELAKSANAAN PROYEK PENINGKATAN JALAN (Studi Kasus Proyek Peningkatan Jalan Dahang-Tentang-Sirimise Kabupaten Manggarai Barat Nusa Tenggara Timur). Undergraduate thesis, Universitas Narotama.

G

G. MAULUDI NIZAR, 03118088 (2022) EVALUASI KINERJA SIMPANG BERSINYAL DAN FASILITAS KESELAMATAN JALAN DI SIMPANG KLETEK – SAWUNGGALING TAMAN - SIDOARJO. Undergraduate thesis, Universitas Narotama.

GUSTIN NURIKA DEFVI, 03117085 (2022) SISTEM PENGADAAN BARANG DAN JASA PT. ADHI PERSADA GEDUNG PADA PROYEK APARTEMENT BeSS MANSION SURABAYA. Undergraduate thesis, Universitas Narotama.

I

IQBAL TSANI, 03121037 (2022) PERENCANAAN BEKISTING SEMI SISTEM (KNOCK DOWN) PADA PEMBANGUNAN GEDUNG OFFICE BUKIT DARMO GOLF SURABAYA. Undergraduate thesis, Universitas Narotama.

ISWATUN CHASANAH, 03118022 (2022) ANALISA KONDISI PADA SAAT TERDAMPAK PANDEMI COVID-19 DALAM BIDANG KONSTRUKSI (Studi Kasus Proyek Perkuatan Dermaga Berlian Tanjung Perak Surabaya). Undergraduate thesis, Universitas Narotama.

Ichwan Ardiansyah, 03120018 (2022) KAJIAN DAMPAK PUSAT PERBELANJAAN TERHADAP SISTEM TRANSPORTASI DIKAWASAN SEKITAR (STUDI KASUS : GALAXY MALL 1 - SURABAYA ). Undergraduate thesis, Universitas Narotama.

J

JOKO FIKARIANTO, 03120015 (2022) PERENCANAAN PENANGGULANGAN BENCANA BANJIR SITIARJO KABUPATEN MALANG. Undergraduate thesis, Universitas Narotama.

JOKO SUSENO, 03117019 (2022) ANALISA PENGARUH BEBAN KENDARAAN TERHADAP PERKERASAN TAMBAHAN (OVERLAY) PADA RUAS JALAN BLORA – CEPU KM 13.00 S/d KM 30.00. Undergraduate thesis, Universitas Narotama.

L

LESTYANTI KURNIASARI, 03118096 (2022) ANALISIS PERBANDINGAN WAKTU DAN BIAYA MENGGUNAKAN APLIKASI MS PROJECT DENGAN METODE PERT PADA PROYEK PEMBANGUNAN GEDUNG SMPN 61 (3 LANTAI) SURABAYA. Undergraduate thesis, Universitas Narotama.

Leo Agus Sulistianto, 03117120 (2022) EVALUASI PEMELIHARAAN GEDUNG DENGAN PERMODELAN VIRTUAL 3D BIM (STUDI KASUS GEDUNG SSC SURABAYA). Undergraduate thesis, Universitas Narotama.

Leonardo Putra Jaya, 03117042 (2022) STUDI PERENCANAAN PENINGKATAN JALAN PADA RUAS JALAN ALAS MALANG – LAKARSANRTI SURABAYA MENGGUNAKAN PERKERASAN LENTUR. Undergraduate thesis, Universitas Narotama.

M

MOHAMMAD EKO HADI WIBOWO, 03119116 (2022) STUDI ANALISIS SALURAN PEMBUANG KEMAYORAN KELURAHAN KEMAYORAN KECAMATAN BANGKALAN KABUPATEN BANGKALAN. Undergraduate thesis, Universitas Narotama.

MOHAMMAD KHAFID ABIDIN, 03118040 (2022) KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK PEMBANGUNAN HUNIAN SEMENTARA DAN HUNIAN TETAP DI DESA SUMBERMUJUR KECAMATAN CANDIPURO KABUPATEN LUMAJANG. Undergraduate thesis, Universitas Narotama.

MOKHAMMAD HANDY BUDIARTO, 03118163 (2022) PENGARUH PENERAPAN SISTEM MANAJAMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) TERHADAP PRODUKTIFITAS TENAGA KERJA PADA PROYEK KONTRUKSI DI SURABAYA ( Studi Kasus Pembangunan Apartemen PT Tata Bumi Raya ). Undergraduate thesis, Universitas Narotama.

MUHAMMAD ABDUL ROMLI HAMZAH, 03121039 (2022) RENCANA PERHITUNGAN WAKTU, BIAYA, DAN PELAKSANAAN PEMBANGUNAN GEDUNG RUMAH SUSUN SEDERHANA SEWA (RUSUNAWA) KAMBINGAN KABUPATEN GRESIK. Undergraduate thesis, Universitas Narotama.

MUHAMMAD ALIF LUTFI, 03117015 (2022) DESAIN JEMBATAN BETON PRATEGANG BENTANG 80M (STUDI KASUS JEMBATAN KALI WARKAPI KM 49+250 MANOKWARI - PAPUA BARAT). Undergraduate thesis, Universitas Narotama.

MUHAMMAD FAHYAN SYNATRIA PUTRA, 03117070 (2022) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN PEKERJAAN DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Pembangunan Perikanan dan Kelautan Universitas Airlangga). Undergraduate thesis, Universitas Narotama.

P

PUTRI BARROTUT TAQIYAH, 03121026 (2022) ESTIMASI BIAYA DAN WAKTU PADA PROYEK PEMELIHARAAN SALURAN PEMBUANG KALI LAMONG DENGAN METODE CRASH PROGRAMME. Undergraduate thesis, Universitas Narotama.

R

ROHMAWATI, 03119051 (2022) PENERAPAN KONSEP EARNED VALUE PADA PROYEK INFRASTRUKTUR SUMBER DAYA AIR (STUDI KASUS PAKET PEKERJAAN KONSTRUKSI REHABILITASI JARINGAN IRIGASI DI SAMPEAN BARU KABUPATEN BONDOWOSO). Undergraduate thesis, Universitas Narotama.

Raimundo Novena Maria Tito Gomes, 03117092 (2022) PERBAIKAN TANAH DENGAN METODE STONE COLUMN DI PELABUHAN INTERNASIONAL TIBAR, TIMOR-LESTE. Undergraduate thesis, Universitas Narotama.

Rakhmadi Thoriq Fajar Sugiyono, 03120028 (2022) ANALISIS PERBANDINGAN KUALITAS, WAKTU DAN BIAYA DALAM PENGGUNAAN BEKISTING METODE SEMI SISTEM DENGAN METODE ALUMUNIUM FORMWORK PADA PROYEK OSAKA RIVERVIEW APARTMENT, TANGERANG. Undergraduate thesis, Universitas Narotama.

S

SALSABILA SYAHDA LARASATI, 03118136 (2022) PENGARUH OJEK ONLINE TERHADAP PENGGUNA ANGKUTAN UMUM DI WILAYAH KOTA SURABAYA. Undergraduate thesis, Universitas Narotama.

SETYO AJI HANDOYO, 03117093 (2022) ANALISIS SAFETY CONSTRUCTION MODELLING PELAKSANAAN RUMAH SUSUN DI SURABAYA SERTA DAMPAKNYA TERHADAP KEAMANAN DAN KESELAMATAN TENAGA KERJA PERKOTAAN. Undergraduate thesis, Universitas Narotama.

SONY WAHYUDI, 03117027 (2022) PENGEMBANGAN SHELTER ANGKUTAN UMUM TERINTEGRASI DENGAN SAMSAT DRIVE THRU SIDOARJO. Undergraduate thesis, Universitas Narotama.

SUCI FITRIYANI SUCI FITRIYANI, 03121017 (2022) PENGENDALIAN BIAYA DAN WAKTU PEKERJAAN PENINGKATAN JALAN KH. SYAFI’I. Undergraduate thesis, Universitas Narotama.

SUGENG HARIYANTO, 03120064 (2022) ANALISIS KEPUASAN PENGHUNI RUMAH SUSUN PASCA PEMBANGUNAN KEMBALI STUDI KASUS RUSUN SOMBO BLOK E PEMERINTAH KOTA SURABAYA. Undergraduate thesis, Universitas Narotama.

SUGIARTI, 03118071 (2022) ANALISIS KINERJA KAPASITAS DAN RUANG PARKIR DI STASIUN SEMUT SURABAYA. Undergraduate thesis, Universitas Narotama.

T

TEGUH PRIYA UTAMA, 03120056 (2022) PERENCANAAN DIMENSI FONDASI DANGKAL TOWER T.18A SUTT 150KV GARDU INDUK MAULAFA – GARDU INDUK NAIBONAT. Undergraduate thesis, Universitas Narotama.

W

WAHYU HIDAYATULLAH, 03121035 (2022) ANALISIS PERBANDINGAN WAKTU DAN BIAYA METODE STRUKTUR SLAB DENGAN DROP PANEL DAN SLAB DENGAN BALOK PADA GEDUNG SMA MUHAMMADIYAH 1 GRESIK. Undergraduate thesis, Universitas Narotama.

Y

YOSI ARTA SARAGI, 03121034 (2022) ANALISIS PERBANDINGAN BIAYA DAN WAKTU BEKISTING METODE KONVENSIONAL DENGAN METODE SEMI-SISTEM PADA KOLOM LANTAI 1-7 TOWER B APARTEMEN GUNAWANGSA GRESIK. Undergraduate thesis, Universitas Narotama.

YUSI PUTRI ASYANI, 03118036 (2022) PENGARUH STRES KERJA TERHADAP KESELAMATAN DAN KESEHATAN KERJA (K3) YANG DIMODERASI OLEH USIA DAN PENGALAMAN KERJA (Studi Kasus Pembangunan SMPN 3 Surabaya). Undergraduate thesis, Universitas Narotama.

Yunia Maulidia, 03117026 (2022) PELAYANAN TRANSPORTASI UMUM KERETA API KOMUTER SURABAYA-SIDOARJO SELAMA WABAH COVID-19. Undergraduate thesis, Universitas Narotama.

This list was generated on Fri May 3 02:27:19 2024 WIB.